中国政策档案 Governance Archive HOLDINGS 248,789 · FONDS 243
Record · cq_zfcxjw ACC. 900089202

Visual Guide to the Notice on Strengthening Survey and Design Management of High Cut Slopes, Deep Foundation Pits, and High Fill Projects

《关于加强高切坡、深基坑和高填方项目勘察设计管理的通知》一图读懂

Issuer
Date
2026-02-12
Instrument
document
Cited by
1
This infographic explains the key requirements of Chongqing's notice on strengthening survey and design management for high cut slopes, deep foundation pits, and high fill projects.
Full text · 原文 455 字
class="trs_editor_view TRS_UEDITOR trs_paper_default"><br> var hasFJ='';<br> if(hasFJ!=''){<br> var FJarr=hasFJ.split("")<br> document.write('附件下载:<br> ');<br> for(var i=1;i');<br> $('.fjxz-item a').each(function(){<br> $(this).attr('_href',$(this).attr('href'));<br> $(this).removeAttr('href');<br> })<br> $('.fjxz-item a').click(function(){<br> downloadFj($(this).text(),$(this).attr('_href'));<br> })<br> }<br> 相关新闻:<br> 《关于加强高切坡、深基坑和高填方项目勘察设计管理的通知》政策解读<br> 政策原文:<br> 重庆市住房和城乡建设委员会关于加强高切坡、深基坑和高填方项目勘察设计管理的通知