Announcement of Random Inspection Results by Fujian Provincial Development and Reform Commission ('Double Random, One Public')

福建省发展和改革委员会“双随机、一公开”抽查情况公示

Issuer
Date
2025-12-19
Instrument
document
Cited by
0
This document publicizes the results of random inspections conducted on two central investment projects in Fujian, covering approval procedures, construction progress, management systems, and engineering quality. Both projects were found to have minor issues, and follow-up rectification is required.
Full text · 原文 1,022 字
class="article_content article_content_01 font_family_cn" ms-class="font{{detailFont}}"><br>   为有效推进中央和省级预算内投资项目建设,依据《政府投资条例》(国务院第712号令)、《企业投资项目核准和备案管理条例》(国务院第673号令)、《国务院关于加强和规范事中事后监管的指导意见》(国发〔2019〕18号)等有关规定,2025年12月11日我委随机抽取2名工作人员,对2个中央投资项目进行随机抽查。现将抽查结果公示如下:<br> 序号<br> 抽查主体<br> 抽查事项名称<br> 抽查对象<br> 抽查<br> 时间<br> 抽查内容<br> 抽查情况<br> 抽查结果<br> 处理情况<br> 备注<br> 名称<br> 单位<br> 统一社会信用代码<br> 1<br> 省发改委<br> 对政府投资项目、中央和省级预算内投资项目以及专项资金项目的监管<br> 平潭商贸服务型国家物流枢纽跨境保税仓及物流基础设施提升项目<br> 平潭综合实验区岚台物流有限公司<br> 91350128MA3454CN9E<br> 12.11<br> 项目审批手续办理情况、项目形象进度和年度投资计划完成情况、项目管理制度建立和运行落实情况、工程质量安全和文明施工情况等。<br> 项目备案、用地、工程规划许可、施工许可等手续已办理;项目管理制度基本建立、运行较好;工程质量安全和文明施工情况按规定落实。目前保税加工仓库正在开展桩基施工,预计年底完成仓库二层结构标高施工;园区配套提升方面,已完成物流分拣线设备采购招标,园区外立面工程完成70%,室外消防改造完成80%。<br> 除中央预算内资金拨付滞后外,其他基本合格。<br> 跟踪管理,督促整改。<br> 2<br> 省发改委<br> 对政府投资项目、中央和省级预算内投资项目以及专项资金项目的监管<br> 平潭金井国际智慧物流园A区<br> 平潭综合实验区中澜投资发展有限公<br> 91350128MA8UU2H22N<br> 12.11<br> 项目审批手续办理情况、项目形象进度和年度投资计划完成情况、项目管理制度建立和运行落实情况、工程质量安全和文明施工情况等。<br> 项目备案、用地、工程规划许可、施工许可等手续已办理;项目管理制度基本建立、运行较好;工程质量安全和文明施工情况按规定落实。1#-3#仓库及4#综合楼主体结构封顶已封顶,目前正在开展1#-3#仓库外立面施工及4#综合楼室内装修施工。<br> 工程进度稍有滞后。<br> 跟踪管理,督促整改。<br> 来源:福建省发展和改革委员会网站<br> 附件下载