Notice of the Fujian Provincial Department of Emergency Management on Adjusting Approval Matters for Extending the Construction Period of Non-Coal Mines

福建省应急管理厅关于调整非煤矿山基建期延期审批事项的通知

Issuer
Date
2026-01-22
Instrument
document
Cited by
0
This notice adjusts the approval procedures for extending the infrastructure construction period of non-coal mines in Fujian Province, modifying the previous requirement that such extensions may generally be granted only once and for no more than one year. The adjustment is made in accordance with provincial requirements on standardizing administrative approval and the normative document review opinion of the provincial justice department.
Full text · 原文 1,880 字
class="article_content article_content_01 font_family_cn" ms-class="font{{detailFont}}"><br> .TRS_Editor TABLE{font-family:宋体;font-size:14px;}<br> .TRS_Editor{font-family:宋体;font-size:14px;}<br> .TRS_Editor P{font-family:宋体;font-size:14px;margin-top:1em;margin-bottom:1em;line-height:1.4;}<br> .TRS_Editor H1,.TRS_Editor H2,.TRS_Editor H3,.TRS_Editor H4,.TRS_Editor H5,.TRS_Editor H6,.TRS_Editor HR,.TRS_Editor BLOCKQUOTE,.TRS_Editor DL,.TRS_Editor DD,.TRS_Editor DT,.TRS_Editor OL,.TRS_Editor UL,.TRS_Editor LI,.TRS_Editor PRE,.TRS_Editor CODE,.TRS_Editor TEXTAREA,.TRS_Editor SELECT,.TRS_Editor CITE,.TRS_Editor PRE,.TRS_Editor CENTER,.TRS_Editor TABLE,.TRS_Editor DIV{margin-top:1em;margin-bottom:1em;line-height:1.4;}<br> .TRS_Editor FORM,.TRS_Editor FIELDSET,.TRS_Editor LEGEND,.TRS_Editor SELECT,.TRS_Editor TR,.TRS_Editor TD,.TRS_Editor TH{margin-top:1em;margin-bottom:1em;line-height:1.4;}<br> .TRS_Editor BUTTON,.TRS_Editor OPTION,.TRS_Editor ADDRESS,.TRS_Editor DFN,.TRS_Editor EM,.TRS_Editor VAR,.TRS_Editor KBD,.TRS_Editor INPUT,.TRS_Editor SMALL,.TRS_Editor SAMP,.TRS_Editor SUB,.TRS_Editor SUP,.TRS_Editor SPAN,.TRS_Editor A,.TRS_Editor B,.TRS_Editor I,.TRS_Editor U,.TRS_Editor S,.TRS_Editor STRONG,.TRS_Editor LABEL,.TRS_Editor IMG,.TRS_Editor BR,.TRS_Editor FONT{margin-top:0;margin-bottom:0;text-indent:0;}<br> 各市、县(区)应急管理局,平潭综合实验区综合执法与应急管理局:<br> 根据《福建省人民政府关于进一步规范行政审批行为改进行政审批有关工作的通知》(闽政〔2015〕68号)及省司法厅《规范性文件备案审查意见书》有关要求,现将《福建省应急管理厅关于进一步加强非煤矿山安全生产行政许可工作的通知》(闽应急规〔2024〕3号)中“建设项目基建期原则上只能延期一次且不得超过一年,逾期应当重新履行安全设施设计审查程序,其中,省应急管理厅负责安全设施设计审查的建设项目基建期延期审批委托设区市应急管理部门开展,设区市应急管理部门不得再行委托,每月延期审批情况应于次月5日前统一向省应急管理厅报告。”调整为“建设项目基建期延期审批由原安全设施设计审批部门负责,原则上只能延期一次且不得超过一年,逾期应当重新履行安全设施设计审查程序”。除此之外,非煤矿山安全生产行政许可事项仍按《福建省应急管理厅关于进一步加强非煤矿山安全生产行政许可工作的通知》(闽应急规〔2024〕3号)有关要求执行。<br> 本通知自印发之日起实施,有效期与《福建省应急管理厅关于进一步加强非煤矿山安全生产行政许可工作的通知》(闽应急规〔2024〕3号)一致。<br> 福建省应急管理厅<br> 2025年7月9日<br> (此件主动公开)<br> 来源:<br> --><br> 附件下载<br> 福建省应急管理厅关于调整非煤矿山基建期延期审批事项的通知.pdf