中国政策档案 Governance Archive HOLDINGS 248,956 · FONDS 243
Record · fj_slt ACC. 900082297

Construction of Solar Power Facilities Along Riverbanks in Fujian: Feasibility and Required Procedures

福建省内河道两边是否能够建设太阳能发电,需要办理什么手续?

Issuer
Date
2022-04-08
Instrument
document
Cited by
0
This document responds to a public inquiry about whether solar power generation facilities can be built along riverbanks in Fujian Province and outlines the required approval procedures and relevant regulations.
Full text · 原文 127 字
当前位置:<br> 首页 > 政务公开 > 解读回应 > 回应关切<br> 福建省内河道两边是否能够建设太阳能发电,需要办理什么手续?<br> 来源:河湖管理处<br> 发布时间:2022-04-08 14:48<br> 点击数:{{pvCount}}<br> |<br> |<br> |<br> <span