Official Reply of Zhongshan Municipal People's Government on the 'Three Olds' Redevelopment Plan for the Clean Energy Theme Industrial Park (Cuiheng New District) Phase I 'Industry-to-Industry' (Government Consolidation) Contiguous Renovation Project
中山市人民政府关于中山市清洁能源主题产业园(翠亨新区)一期“工改工”(政府整备)连片改造项目“三旧”改造方案的批复
This document approves the 'Three Olds' redevelopment plan for a 8.33-hectare parcel in Zhongshan's Clean Energy Theme Industrial Park, adopting a government consolidation model for industrial land renovation. It sets conditions for land supply, planning, environmental compliance, and a two-year validity period for implementation.
Document Text
651 characters
市自然资源局: 你局《关于报送〈中山市清洁能源主题产业园(翠亨新区)一期“工改工”(政府整备)连片改造项目“三旧”改造方案〉的请示》(中山自然资报〔2023〕1013号)收悉。经研究,批复如下: 一、原则同意上报的《中山市清洁能源主题产业园(翠亨新区)一期“工改工”(政府整备)连片改造项目“三旧”改造方案》(下称《改造方案》)。同意该项目采取政府整备的改造模式,改造项目涉及用地经完善用地手续后,交由政府整备,并依据《中山市南朗横门片区D-01街区控制性详细规划调整》(中府函〔2023〕46号),由采用公开出让方式供地确定的改造主体,对位于中山市清洁能源主题产业园的8.3347公顷(83347.23平方米,折合约125.02亩)规划一类工业用地实施全面改造。 二、《改造方案》的实施,应符合我市城市更新(“三旧”改造)有关规定,以及我市有关土地供应、规划管控、产业准入、水体治理和环境保护的要求。 三、你局要牵头会同相关部门依法依规做好该项目实施建设的跟踪、督办和考核工作,确保该项目有序实施建设。 四、翠亨新区管委会要在本批复之日起一年内申请办理供地,在规定期限内签订土地出让合同,按照土地出让合同确定期限按期动工、按期竣工,逾期未申请办理供地、未签订土地出让合同以及未按期实施建设的,视为本批复自动失效。 五、本批复自印发之日起生效,有效期2年,项目动工时间以批复的《改造方案》和日后签订的土地出让合同为准。超过有效期2年未动工的,视为本批复自动失效。 中山市人民政府2023年9月7日
Topics
urban renewal
industrial land redevelopment
clean energy industrial park
Metadata
| 文号 | 中府函〔2023〕223号 |
| Publisher | 中山市人民政府办公室 |
| Site | zhongshan |
| Date | 2023-09-11 14:57:48 |
| Category | major_policy |
| Policy Area | 城市更新与产业用地改造 |
| CMS Category | 其他文件 |
Verification
References (4)
| unkn 中山自然资报〔2023〕1013号 | formal |
|
unkn
中府函〔2023〕46号
中山市人民政府关于中山市南朗横门片区D-01街区控制性详细规划调整成果的批复 |
formal |
| unkn 关于报送〈中山市清洁能源主题产业园(翠亨新区)一期“工改工”(政府整备)连片改造项目“三旧”改造方案... | named |
|
unkn
中山市南朗横门片区D-01街区控制性详细规划调整
中山市人民政府关于中山市南朗横门片区D-01街区控制性详细规划调整成果的批复 |
named |
Citation Network
Full network →