中国政策档案 Governance Archive HOLDINGS 191,422 · FONDS 70
Record · 财政部 ACC. 12684201

Ministry of Finance and Ministry of Housing and Urban-Rural Development Jointly Issue Measures to Improve Settlement of Construction Project Prices

财政部 、住房城乡建设部联合发文完善建设工程价款结算有关办法

Issuer
财政部
Date
2022-06-30
Instrument
regulation
Cited by
0
This document establishes new rules for the settlement of construction project prices, requiring timely payment and reducing disputes. It aims to standardize the settlement process and protect the legitimate rights of contractors.
Full text · 原文 2,223 字
.TRS_Editor P{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor DIV{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor TD{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor TH{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor SPAN{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor FONT{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor UL{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor LI{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor A{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}<br> .TRS_Editor P{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor DIV{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor TD{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor TH{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor SPAN{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor FONT{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor UL{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor LI{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}.TRS_Editor A{margin-bottom:1em;line-height:1.8;font-family:宋体;font-size:12pt;}<br> 财建〔2022〕183号<br> 党中央有关部门,国务院各部委、各直属机构,全国人大常委会办公厅,全国政协办公厅,最高人民法院,最高人民检察院,各民主党派中央,有关人民团体,各中央管理企业,各省、自治区、直辖市、计划单列市财政厅(局)、住房和城乡建设厅(委、管委、局),新疆生产建设兵团财政局、住房和城乡建设局: <br>   为进一步完善建设工程价款结算有关办法,维护建设市场秩序,减轻建筑企业负担,保障农民工权益,根据《基本建设财务规则》(财政部令第81号)、《建设工程价款结算暂行办法》(财建〔2004〕369号)等有关规定,现就有关工作通知如下: <br>   一、提高建设工程进度款支付比例。政府机关、事业单位、国有企业建设工程进度款支付应不低于已完成工程价款的80%;同时,在确保不超出工程总概(预)算以及工程决(结)算工作顺利开展的前提下,除按合同约定保留不超过工程价款总额3%的质量保证金外,进度款支付比例可由发承包双方根据项目实际情况自行确定。在结算过程中,若发生进度款支付超出实际已完成工程价款的情况,承包单位应按规定在结算后30日内向发包单位返还多收到的工程进度款。 <br>   二、当年开工、当年不能竣工的新开工项目可以推行过程结算。发承包双方通过合同约定,将施工过程按时间或进度节点划分施工周期,对周期内已完成且无争议的工程量(含变更、签证、索赔等)进行价款计算、确认和支付,支付金额不得超出已完工部分对应的批复概(预)算。经双方确认的过程结算文件作为竣工结算文件的组成部分,竣工后原则上不再重复审核。 <br>   三、本通知自2022年8月1日起施行。自此日期起签订的工程合同应按照本通知执行。除本通知所规范事项外,其它有关事项继续按照《建设工程价款结算暂行办法》(财建〔2004〕369号)执行。 <br>   财政部 住房城乡建设部<br>   2022年6月14日